In a recent Lean Six Sigma Project kick-off meeting of one of my clients, after the teams presented their project charters, the business leader made an extempore announcement that the best and most successful Lean Six Sigma project will receive a special recognition and the team members will be lucratively rewarded.
Immediately few of them wanted to know what criteria will be used for selection. The business leader indicated that I will be one who will define the criteria for successful Lean Six Sigma Project.
Factors that I consider among the criteria for success of Lean Six Sigma Projects are arranged in the descending order of their importance in the below list:
Project Scope – Lean Six Sigma projects without well-defined scope are bound to fail, but they end up creating a lot of mess around. Scope usually refers to the boundaries of any project. A poorly defined project is one which hasn’t balanced the Project Goal, Scope and Timelines. Also, poorly communicated scope and not defining what is out of scope are equally important.
Retains interest and commitment of the resources – Improvement projects are successful when its team members contribute their best. Lean Six Sigma projects usually challenge the existing paradigm. Hence without the wholehearted and continued participation of the team members, no project will be successful. The sponsor/champion and the Green Belt/Black Belt are entrusted to retain the interest and commitment of the resources.
Attracts adequate buy-in from key stakeholders – Stakeholders of any project could either be the decision makers, important players who influence the decisions or even impacted parties. Successful Lean Six Sigma projects will have to manage the expectations of all the above stakeholders from time to time and create adequate buy-in. Rather than focusing too much on technical root cause analysis, the emphasis should be on how Lean Six Sigma project can bring about mid-to-large change in the organization.
Flawless execution– Immaterial of the breadth and depth of the analysis done in any Lean Six Sigma project, what sticks out is execution. Well led and implemented the project is bound to be successful, as even the quality of data collected and analysis is a function of the flawless execution. Adherence to weekly team meetings, project milestones, and tollgates reviews are some simple and easy signs to evaluate execution. Further unbiased data collection and analysis, open minded assessment of solutions, in-depth piloting and sustained monitoring are additional measures of flawless execution.
Identifiable impact on customers– As the proof of the pudding is in the eating, so is the success of any Lean Six Sigma in positive impact it creates on customers. Usually, organizations evaluate the success of projects based on the performance of the CTQ (before-after studies). While this is definitely a good way to assess the impact, more often than not such movements in CTQs aren’t felt by customers. Considering several other business parameters to validate the impact of the CTQ, including post improvement Voice of Customer may be a very good method. For example, a reduction in defects certainly will reduce the rework effort, increase productivity, reduce complaints, apart from increasing customer satisfaction.
Making a discovery – Any successful Lean Six Sigma project should unearth something new, make a discovery about the problem. A project without a discovery could mean we are fixing obvious things. In order to ensure the project team makes a discovery, the quality of work done in the Measure and Analyze phase have to be evaluated. Have the teams identified all possible causes to the problem? Have they collected data of good quality and quantity? Have they holistically analyzed the data to make the discovery? And finally what is the discovery?
Based on my experience with Lean Six Sigma in the last 2 decades, I would consider these 6 factors as significant elements of the successful project.


Tags


Tags

We talked about the need for Lean Six Sigma project selection in detail in the earlier articles, in this one we’ll cover the criteria for selection and the in the following article, we’ll move on to talk about the tools used for selection and how to engage the stakeholders in the process.

I have found that while leaders agree on the need for project selection, their views on the criteria is quite divergent. Most of them see this as a process to sway the process in favor of their priorities and interests.
There is nothing wrong in doing so, as long as the process is not biased.

Through this article, we draw consensus on the criteria and its relevance to the whole process.

The real good news is that the criteria for getting the project selection right are not too complicated.

What does project selection countdown look it? We’re going to start with the least of the top 5 criteria and find our way to the top most criteria.

Here you go:

7. Probability of Success:

Not all the projects will be successful in any company. Hence, while selecting the project, most project leaders consider the contingencies which might come up and use that as a yardstick to select the project. Sponsors want their project leaders to be successful equally as projects leaders’ desire success. Well, sounds like a good approach. But doesn’t this approach make it very orthodox? Unlike other implementation projects in technology, improvement projects are bound to have ups and downs; and it is quite natural that not all projects achieve their goals. That is what continuous improvement is all about.
Thus choosing to play it safe isn’t the best criteria to select projects, though unfortunately, it is very popular criteria in use. That is why Probability of Success is the last in our countdown list! One of the organizations flips these criteria to select the project which has failed in the past or have a low probability of success as Black Belt project.  That is certainly a best practice to emulate.

6. Availability of Data:

Is data readily available for the project? If not, can it be easily gathered? While most project leaders and sponsors know that rarely will all the data needed for a project is waiting around to be analyzed. But they use the availability of data criteria to select projects because the unreasonable expenditure of time, resources and effort can be avoided. Yes, data is needed for analysis. But making it a criterion reduces the scope Continuous Improvement deployment.
Improvement projects are expected to venture into unchartered territories of the process and present root cause and opportunities. Getting people to measure something that is not being reported till now, in it is a feat. Having vanilla project can hardly be a criterion for project selection. That is why the availability of data comes second last in our countdown!

5. Savings potential:

Any project implemented, is implemented with an intention to gain any kind of tangible or say monetary benefits. But along with monetary benefits, there are other benefits like customer satisfaction, increased efficiency, total company involvement; increases workspace and much more. While it is absolutely apt to select projects which have savings to the organization, it is misleading to make saving potential a primal purpose of projects. I have seen many times, project leaders come up with simple ideas or improvements with a huge saving potential to the organization, but virtually no complexity involved. Such projects hardly qualify for Black Belt projects.

They best serve as Just Do It project. Giving undue importance to saving potential in project selection also sends the wrong message across the organization. That is why I not really excited about having this as a top item in the countdown. That’s why Saving Potential is only Number 5 in our countdown.

4. Apt Time:

There is always a perfect timing to initiate a project. Relevance is contextual. By apt timing, I mean both the time to commence, and the closure as per plan. An important project has to close on time. It has to be first of all, planned to close on time. It has to be scoped to close on time. That is why Apt Time is No.4 in our countdown.

3. Availability of Resources:

I don’t know if this has to do with the culture. Most organizations, if not all, end up with a laundry list of projects because everything seems to be Business or Customer priority. Even the biggest and richest of the organizations have limited resources. Either resource is depleted, busy elsewhere or simply not committed to deliver. The best person is often leading many projects, making everything he/she does venerable to failure. Project selection is about de-selection and not selected. Ruthlessly put ideas into a parking list for which right resources are not available; and if it is so important that it has to be executed now, then pull the right resource into this project rather than sharing.

While I have largely kept this point around manpower, it equally applies to money & time. I say with conviction that organizations that ensure that the leader of the Lean Six Sigma project is a dedicated resource, either full time or handling only one project even if it means he is part time on it are surely successful. This is why Availability of Resource is No.3 on our countdown!

2.Customer impact:

Ask yourself “will the results of the project bring any difference in the life of the customer? Will it improve the perception of the customers about the quality of your product or services?” Quite often this answer to this question is yes. Unfortunately, it’s motherhood in apple pie question. So insist on quantifying the impact.

If you can pin a number to the impact, then go ahead. And if you’re not able to do so, then there’s no point in wasting your time on the project. Consider Voice of the Customer in your organization as a starting point. Why don’t you start with complaints and alleviate customer pain? Thus Customer Impact is Number 2 in the countdown.

1.Business Priority:

Selection of projects is based on the need or priority of the business. Project leaders need to understand that the tail can’t wag the dog. Often, people package their ideas into a project and fuel it as an organizational priority. Scanning of the external and internal environment will give first-hand insight on what is the organizational priority, NOW? Go for it. Well, that may put you out of your comfort zone, competency or expertise, but remember that’s what the organization needs.
Without a real need, do you think any leader would offer sponsorship to your project or will it at all help anyone – NO.? That is why Business Priority is Number 1 in our countdown.
Project Selection and implementation of Lean Six Sigma is easy and at the same time should be handled delicately by keeping all the above aspects in mind otherwise it might turn into a big disaster. An effective diagnostic study is required before selecting projects and with the undivided involvement of the top management are pre-requisites for project selection.


Tags

Criteria for project selection from Canopus Business Management Group

Tags

Continuous Improvement from Canopus Business Management Group

Tags

While leaders strive to build a culture of continuous improvement (CI) in their organizations, it is equally important to understand that business-as-usual activities take precedence over improvement activities. CI programs commence with a big bang and a lot of enthusiasm, but time wears out even the strongest and what it leaves behind is mere CI hubbub. This is not a simple problem to solve. If you have been part of any enterprise-wide CI deployment, you will have no difficulty relating to this. This problem is complex and has several failure modes.

In this article, I’ll like to highlight a common but significant failure mode – Selection of projects. It’s needless to emphasize that projects play a big role in any CI journey, but to its disgrace, projects are also a significant contributor to the downfall of CI program.

Going overboard and having too many concurrent projects is one way to fail. Not selecting the right projects to pursue is another. Here are few compelling reasons to consider project selection as an important activity rather than opening the floodgates of projects:

Business Priority: Every business has its own priorities and so it’s important to select the right projects that are aligned with your priorities. Having many dispersed projects will blemish, if not nullify the impact of projects. Alignment between leader’s priority & CI program can be easily accomplished if you select projects right at the beginning.

Change due to competition: If your competition is disrupting the industry, well you better select where you need to improve. External environment often forces organizations ruthlessly reform their way of thinking and working. And today, we all live in a world that is fast changing. So unless your right projects are selected and pursued, your CI program will become redundant soon.

High Customer Expectations: Everyone I talk to says, customers are demanding more than ever before. Understanding the changing their needs and aligning the CI program to customers is vital to the success of any organization’s CI program. Organizations sometimes pursue trivial opportunities such as cost saves but miss on acting on big ticket customer facing projects or customer pain points. Of course, while dealing with customers, things are going to be volatile, but that’s not a reason to avoid them. The good project selection process should filter such project opportunities.

Limited Budgets: All organizations must work within the framework of budgets. Improvements need monetary resources to support the change. Sometimes they are direct and hence easily associated to direct cost centers. But projects with intangible benefits or the ones incurring indirect costs usually end up as scapegoats. If an organization commits to project selection, many such failures can be prevented.

Availability of Resources: Human capital is scarce. CI projects need quality time and mindshare from people of importance in the organization. Quite often resource requirements are never considered during the commencement of projects. Even if considered, it’s only the project leader’s time. As CI projects are a cross-functional effort, active participation of experts from all involved functions defines the success of the project. In order to ensure we get the best out of our teams, we need to time our success. Thus project selection is a time sensitive activity.

Optimizing Number of Projects: Not all the areas of your organization need improvement at the same time, And improvement culture building is a slow and steady process which can never be implemented overnight, nor will the results reap overnight. So getting to rush out the organizational adrenaline may not be a success recipe for good CI program. Selection of projects will ensure that you sustain optimum enthusiasm in the system for CI.
So it is very evident that selection of projects impacts the CI culture, employee satisfaction, alignment to customers and ROI to business for the investments it makes in CI in a positive way. In the future articles, we’ll take this one step further and talk about the criteria used for selecting projects.


Tags

Have you ever confronted a situation doing hard work the whole day and at the end you realize that most of the time had been given by you and your team to the Non Value Added things!  how to eat an elephant
One of the important aspects of the leadership in today’s competitive world is Prioritization. It helps to save time and money as you will be able to focus on what is important at the expense of lower value activities. Prioritizing skills are your ability to see what tasks are more important at each moment and give those tasks more of your attention, energy, and time.
We all have so much on hand to do and really speaking so much time to finish the things up. But we lack the skill to manage our work with the time. We mostly forget to take up the important things first and less significant work later. Instead, we do completely opposite to this. This is human nature as we all do the same thing in our day to day lives.
This issue is pertinent not only at an individual level, but even at organizational level. Organizations focus on the wrong reasons or causes and waste a lot of effort to solve a problem or improve their business.
How to improve upon it?
Lean Six Sigma teaches a very useful technique of prioritization to overcome this problem which is a mother of our all the other problems.
Pareto Analysis is based on 80/20 rule which says that our 20% efforts (out of the whole 100%) will give 80% of the benefits. This can be interpreted in many different ways like, for sales people 80% of the orders will come from the 20% of the customers, for team managers 20% people of the whole team shall give 80% of the work or results. Here, we should keep in mind that this doesn’t mean that the rest 20% is not important at all but can be said as less significant.
To generalize, 80% of the problem is caused by 20% of the reasons!
Thus using the Pareto principle, we can derive maximum impact with minimum effort and within short time span, if we focus on the right factors. Simple it is, right?
Before understanding the benefits of Pareto Analysis there are certain facts to be known about it. They are as under:

  • This principle was developed in the year 1896 and is named after Vilfredo Pareto who was an Italian engineer, sociologist, economist, political scientist, and philosopher.
  • Pareto derived this concept by his work and experience and observed that 80% of the wealth in Italy belonged to 20% of the people.
  • In the year 1941, Dr, Joseph Juran who was an evangelist of quality and quality management as he was an engineer and a management consultant cam across the concept of Pareto Principle. He then started applying the principle in the quality and derived a phrase through experience that is “there are vital few and useful many”.
  • The Pareto Principle can be implemented in many different aspects such as in science, management, business, in software, in sports, occupational health and safety, financial service industry, and implementing projects which says that put 80% of your time in 20% of your project which will save a lot of your time and energy.
  • Pareto principle can be graphically represented by Pareto Chart that contains bothbars and a line graph, where individual values are represented in descending order by bars, and the cumulative total is represented by the line.

With an example given as under you will be able to understand why to focus on significant few:
Pareto
Our Online Lean Six Sigma Green Belt Certification course teaches you step by step procedure to construct a pareto chart, different pareto variants and how to interpret them. More importantly it covers when and when not to apply pareto principle.
Benefits of Pareto Analysis:

  1.  Improved Decision Making: With a focus on resolving problems, the procedures and processes required to make the changes should be documented during a Pareto analysis. This documentation will enable better preparation and improvements in decision making for future changes.
  1. Increased Efficiency: Once the changes or problems are listed, they are ranked in order from the biggest to the least severe. The problems ranked highest in severity should become the main focus for problem resolution or improvement. Focusing on causes and problem resolution contributes to organizational efficiency.
  2. Enhanced Problem Solving Technique: Members of a group can conduct a Pareto analysis together. Arriving at a group consensus about the issues that require change fosters organizational learning and increases group cohesiveness. Lean Six Sigma Green Belt Certification course shall help the individuals of the company learn many tools along with Pareto Analysis which shall also help him or her to boost their careers.
  3. Saves Time and Money: Doing right things at the right time with right people and at the right place is naturally going to save time and money and this has to be calculated by multiplying the time with the number of individuals involved in the process.

Tags

As we all know that there are different levels of certification in Lean Six Sigma and these levels have been associated with “Belt” titles. It’s a very obvious question that why the levels here have been associated with the titles used in Martial Arts? That is because of the association of discipline and rigor in Lean Six Sigma similar to the martial arts.
You would find four commonly used belt titles in Six Sigma Certification and they are Yellow Belt, Green Belt, Black Belt and Master Black Belt. However, the most basic level in Lean Six Sigma is sometimes called as “White Belt”. A White Belt understands the theoretical aspects but virtually no application knowledge of the Lean Six Sigma concept. One could say this is an entry level awareness program. Let us understand one by one, the four belts mentioned above.

  1. Yellow Belt: A Yellow Belt is someone who has undergone a basic training program that is may be a day’s training with a basic level of understanding of the quantitative part of the concept. He or she is able to appreciate the goals of Lean Six Sigma. Having knowledge of Yellow Belt level means that person is able to apply basic tools in the company and undertake simple improvement projects. Usually the organization who wants to implement Lean Six Sigma wants all their employees to be at least Yellow Belt trained as this makes the implementation and change management easier and faster.

 

  1. Green Belt: Lean Six Sigma Green Belt receives a training of at least one week with emphasis on DMAIC method and tools. DMAIC is problem solving methodology which stands for Define, Measure, Analyze, Improve, and Control through which he/she is able to undertake improvement projects in his/her process which improves customer satisfaction and efficiency of the process. Green Belts are also called as “Work Horses” having the following responsibilities:
  • Initial analysis of company like Gemba Walk and Data Analysis which will be helpful in defining the road map of the project.
  • Define the project and prepare the project charter.
  • All over co-ordination with management, yellow belts, black belts and master black belts.
  • Facilitate the team through all phases of the project.
  • Provide training to the team for effectiveness of the implementation.

 

  1. Black Belt: A black belt is someone who receives at least 3 to 4 weeks of extensive training with the emphases on DMAIC method and tools which is explained as above. Unlike a green belt, black belt is a full time role who has the responsibility to run large scale high impact improvement projects where he mentors and coaches green belts. Responsibilities of a black belt are listed as under:
  • Helps in deciding the project.
  • Helps in refining the project charter and makes sure that the things are moving in the desired direction.
  • Leads, mentors and coaches green and yellow belts and champions.
  • Empowers the team members to design experiments and analyse the data required for the project.
  • Provide training in tools and team functions to project team members.
  • Makes sure that the project succeeds.
  • Maintains balance between Management, Employees and Customer’s needs.
  • Manages the team for effectiveness and efficiency.

 

  1. Master Black Belt: It is usually a leadership role having excellent change management skills along with having good technical knowledge. After completion of the black belt course and having good experience he/she receives additional 3 to four weeks of training mostly around change management and statistics. MBB’s primary role is to deploy six sigma concepts in the organization, advice to executives or business unit managers, and leverages, his/her skills with projects that are led by black belts and green belts. A Master Black Belt reports the senior or top management and coaches the black belts and Green Belts. Responsibilities of Master Black Belts are enumerated as under:
  • Provides guidance to senior executives and top level managers on Six Sigma management.
  • Help identify and prioritize key project areas in keeping with strategic initiatives.
  • Continually improve and innovate the organization’s Six Sigma process.
  • Apply Six Sigma across both operations and transactions-based processes such as Sales, HR, IT, Facility Management, etc.

If you want to start your journey in Lean Six Sigma, its best you start by understanding some of the basics of Lean Six Sigma. Our Lean Six Sigma Primer Course is Free and it gives a great deal of information on Six Sigma. From there on you could more to Yellow Belt and Green Belt. This approach is pragmatic because it optimizes your investment of resources, time and effort.


Tags

As a business analyst you are often expected to act as a bridge between a functional domain and the business stakeholders. Business analysts must be great verbal and written communicators, tactful diplomats, problem solvers, thinkers and analyzers. Though you have been extensive training in project management and related areas, using systematic business and management tools such as graphical analysis, data distribution & visualization, statistical discovery, etc are considered to be difficult by many Business Analysts.
Fortunately Lean Six Sigma, which is process improvement methodology provides many of the tools that can  be handy for Business Analysts at one place. It comprises of statistical tools and techniques along with visualization tools.  There are many tools such as Visual Analysis & Data Discovery tools like Fish-bone, 5 why, in scope-Out scope, Box plots and analytical tools like MSA, Descriptive Statistics, Variation, Correlation and Regression. They are explained in brief as under:
Visual Tools:
There are many tools which a business analyst will learn from Lean Six Sigma Green Belt Certification. We’ll talk about few Visual analysis tools from Lean Six Sigma in brief as under:

  • Fish Bone Diagram also called as Cause and Effect Diagram helps to reach the root cause of any business issue. The important characteristic of this tool is to categorize the issue into 6 different aspects like Men, Machine, Material, Measurement, Method and Mother Nature (Environment). This will help the analyst prioritize the problem and solve the problem in a systematic manner.
  • Another tool for root cause analysis is 5-Why which involves repeating the question “Why” where each question forms the base of the next question and this will go on until the root cause is found. All the questions and answers of the 5 Why, are placed on a sheet of paper with the help of which the analyst can view the whole picture in a single page.
  • Box plot is a quick way of visualization of data and is represented in the form of box & whiskers. It helps in scrutinizing and comparing sets of data which demonstrates the variation in the sample data set.
  • Statistical process control (SPC) is method of measuring and controlling KPIs of any process. AKA control charts, this helps to proactively identify issues from data. It is a great tool for continuous monitoring of process parameters both in service and manufacturing processes.
  • Run charts are similar to control charts and suggest shifts in the process over a period of time and points out special factors which influence the process variability.
  • FMEA stands for Failure Modes and Effect Analysis which is an approach to identify all possible failures in any process. Like doing analysis of how and where we can fail so as to take precaution before even starting the implementation of any project. This is a very important element for the success of any project which will help a business analyst in his/her daily management.

Analytical Tools:
Here are few examples of data discovery analytical tools that a Business Analyst will learn from Six Sigma.

  • Quite often Business Analysts struggle with poor data quality. MSA aka Measurement System Analysis is a Lean Six Sigma tool  used to evaluate that whether the data collection method, the instruments/source used for measuring and whole measurement is precise & accurate or not. This is also used to ensure the integrity of data used for analysis and gauge the effects of errors in measurement used to make decisions taken for product or processes.
  • Descriptive statistics includes the assessment of central tendency and measures of dispersion in the any data set. Further it helps to identify skewness, kurtosis, outliers, and specific patterns in the distribution.
  • Analysis of Variance abstracted as ANOVA is a statistical hypothesis test used to identify significant factors that cause a particular business issue. The biggest the merit of such advanced statistical methods is in confidence & credibility that a Business Analyst can provide to the leadership and management on his analysis and conclusions.
  • Correlation & Regression are similar tools used to establish a relationship between the two business variables such as revenue and capacity. By validating such relationships, the Business Analyst can bring out significant insights to the management.

A business analyst having Green Belt Certification shall have a comprehensive understanding of Lean six sigma and shall be able to apply its tenets to their daily work. The principles of Six Sigma are so widely applicable that employees getting trained are highly valued and aggressively sought after. Lean Six Sigma Certification will be a stepping stone for professionals to a higher level as you avail expertise in different problem solving tools and techniques of Lean Six Sigma.